Practical guidance on facilities management, compliance and the regulatory changes affecting schools, housing associations and community organisations across the North West.
From September 2026, every school needs a published allergy policy, a named senior lead, staff training, spare adrenaline pens and Individual Healthcare Plans. Here's what to check now.
The Government's Construction Products Reform White Paper proposes a General Safety Requirement covering safety-critical products like fire doors. Here's what's proposed and when it lands.
Since 30 September 2026, Approved Document B requires more than one common staircase in new 18m+ blocks of flats. Here's what changed, the transitional arrangements, and what to check.
The Public Office (Accountability) Bill is still progressing through Parliament, but its duty of candour will reach local authorities, academy trusts and other public bodies. Here's what to prepare for.
Paper waste transfer notes are being phased out. Here's what mandatory digital waste tracking, in force since 1 October 2026, means for licensed sites in England and Wales.
BS 8214:2016 has been withdrawn. Here's what the new fire door code of practice actually changes, and what it means for your next fire door inspection.
In force from 6 April 2026, these regulations require person-centred evacuation plans for residents needing evacuation assistance. Here's what responsible persons must do.
The Terrorism (Protection of Premises) Act 2025 is enforceable from spring 2027. Here's what standard-tier compliance actually means for schools and community venues.
Phase 2 extends fixed repair-response deadlines beyond damp and mould to cold, heat, structural issues, electrical hazards and more. Here's what changes.
From 1 September 2026, the supervision exemption disappears from the definition of regulated activity. Here's what that means for volunteers and DBS checks.
The Building Safety Regulator is now independent of the HSE, fire door standards have moved on, and paper logbooks no longer cut it. Here's what's changed.
A permit-to-work scheme is one of the simplest ways to stop a routine contractor job turning into a serious incident. Here's when you need one and how to set it up.
Reactive maintenance feels cheaper right up until something fails at the worst possible moment. Here's the real case for a planned maintenance schedule.